The materials an Apprentice must prepare for their End Point Assessment (EPA) depend on their apprenticeship standard. This article explains what to prepare for each EPA method used at Multiverse. For dates and results, see "Your End Point Assessment: What It Is and What Happens at Each Stage." For how to submit finished materials, see "When and How Should I Submit My EPA Work-Based Project?"
Check Which EPA Method Applies to the Programme
Multiverse apprenticeships use one of two EPA methods. The Apprentice's Coach confirms which method applies, but the table below gives a general guide by programme.
Programme | EPA Method |
Data & Insights for Business Decisions (DIBD), Level 3 | Portfolio and Scenario Demonstration |
Data Fellowship, AI for Business Value, AI-Powered Productivity, Business Transformation Fellowship, and similar Level 4+ programmes | AM1 Work-Based Project and AM2 Professional Discussion |
You may see "AM1" and "AM2" used on any programme, including DIBD. They simply mean Assessment Method 1 and Assessment Method 2. What each method actually involves depends on the specific standard, not the label.
Important: An Apprentice must prepare for the method that matches their own programme. The two methods use different materials and different timelines.
Method 1: Portfolio and Scenario Demonstration
This method applies to DIBD Level 3 apprentices, assessed by Accelerate People.
Portfolio of Evidence
The Apprentice builds a portfolio throughout the apprenticeship. The portfolio shows real workplace examples of the Knowledge, Skills, and Behaviours (KSBs) required by the standard. The examiner uses the portfolio to guide a Professional Discussion: a structured conversation, not a memory test.
Scenario Demonstration
The Scenario Demonstration is a timed exercise. The Apprentice receives a realistic work task and analyses it on the spot, then answers follow-up questions from the assessor.
Method 2: AM1 Work-Based Project and AM2 Professional Discussion
This method applies to Data Fellowship and most Level 4 and above programmes.
Project Proposal (Before Gateway)
Before Gateway, the Apprentice submits a short project proposal. This scopes the business problem the work-based project will address. The Coach confirms the exact word limit for the programme. The post-Gateway email confirms the proposal is approved to proceed; there is no separate confirmation.
Work-Based Project (After Gateway)
After Gateway, the Apprentice writes the full work-based project report. This is a longer document than the proposal and maps directly to the KSBs required by the standard. The Coach confirms the required word count and format for the specific programme.
Presentation and Speaker Notes
The Apprentice prepares a presentation to accompany the work-based project, with speaker notes. The Apprentice delivers this presentation during the AM1 assessment, followed by a questioning session.
Portfolio for AM2
Separately, the Apprentice builds a portfolio of evidence for the AM2 Professional Discussion. This portfolio must cover different KSBs to the ones evidenced in the AM1 work-based project. Covering the same KSB in both AM1 and AM2 does not meet the assessment requirement.
Where to Find Preparation Support
The Apprentice's Success Coach runs EPA office hours ahead of the EPA period. Office hours are the main scheduled preparation support. Coaches also offer practice sessions for the interview and presentation components, and short 1:1 check-ins for revision strategies and general EPA process questions. There is no separate mandatory "EPA Prep Clinic". If an Apprentice cannot find office hours or related materials on the Multiverse platform, they should contact their Coach directly or raise it with Support through the Support Hub.
Frequently Asked Questions (FAQs)
Questions | Answers |
Question: How do I know my project proposal was approved? | Answer: There is no separate approval email. The post-Gateway email from the End Point Assessment Organisation (EPAO) confirms the proposal is approved and includes the EPA start date. |
Question: I uploaded my project but got no confirmation. Did it work? | Answer: The submission portals do not send a confirmation email or receipt. Check "When and How Should I Submit My EPA Work-Based Project?" for how to confirm an upload on your specific portal. If you are still unsure whether your upload succeeded, contact Support through the Support Hub. |
Question: Can I cover the same topic in both AM1 and AM2? | Answer: No. The AM1 work-based project and the AM2 portfolio must evidence different Knowledge, Skills, and Behaviours. Repeating the same topic across both does not meet the assessment requirement. |
Question: What is Module 9, and do I need to submit it as part of my EPA? | Answer: On some programmes, Module 9 is a practice project used for preparation only. It is not part of the EPA submission. Apprentices should confirm with their Coach whether this applies to their specific programme, as this varies between programmes. |
